top of page

Level 02 BIM

Level 02 BIM seems to become the norm within the industry especially for larger scale projects where coordination issues can be resolved during the design stage instead of the construction stage where this can prove much more costly. I am very familiar with working in a level 02 BIM environment. Bim level 02 can only be achieved if the entire design team including contractor are on board and strictly follow all requirements set out in the BIM execution plan.

bottom of page