COADY Architects, as part of Stewart Construction Design & Build team, has commenced work on the construction of Ireland’s next generation business hub at Dublin Airport Central, a new business campus being developed by the DAA located directly opposite Terminal 2. Phase 1 will provide 20,000SQM of Grade A, LEED ‘Gold’ Certified flexible office space, an elevated pedestrian walkway with direct connections to the terminal buildings and a significant area of landscaped public realm within the campus. The project is programmed for completion by March 2019.
COADY Architects, as part of Stewart Construction Design & Build team, has commenced work on the construction of Ireland’s next generation business hub at Dublin Airport Central, a new business campus being developed by the DAA located directly opposite Terminal 2. Phase 1 will provide 20,000SQM of Grade A, LEED ‘Gold’ Certified flexible office space, an elevated pedestrian walkway with direct connections to the terminal buildings and a significant area of landscaped public realm within the campus. The project is programmed for completion by March 2019.
Architectural Technologist BSc
& BIM Manager
Scope_ Part 8 Planning Documentation
Location_ Limerick, Ireland
Client_ Limerick 2030 Strategic Development DAC
Value_ Part 180 Million Euro
Year_ 2017 - 2018
Project Opera
Project Opera was a very interesting project I was involved in with Coady Architects, as part of Aecom Construction. My role was to produce planning drawings using Revit and steer the submission through to An Bord Pleanála as aPart 8 planning submission. The downtown site hosts leisure and retail, a state of the arts new library along with residential units and an aparthotel. Private companies are developing commuter villages such as Clarina with housing.
Description
See examples below of third-party CGI's produced from Revit Models.
See examples below of drawings I completed as part of the Part 8 plannig submission.